Capital costs at this level of operation were to be US/lb of copper and operating costs, as shown in Table 2, were estimated at US/lb of copper. 28 The average ore grade is % copper and the estimated recovery is %. The operation was upgraded to 180,000 tons per year before it was completed and to 250,000 tons per year in 2001.